Difference between PERT and CPM
Program evaluation and review techniques (PERT) |
Critical Path methods (CPM) |
It’s origin in military and usually used in research & development type project like defense |
It’s origin in industry. It is used in construction industry bridge, dams, tunnels, high way etc. |
Event oriented approach |
Activity oriented approach |
Allows uncertainty |
Does not allow uncertainty |
It is probabilistic model |
It is deterministic model |
Time based |
Cost based |
Doesn’t demarcate between critical and non-critical activities |
Marks critical activities |
Average the time |
Doesn’t average the time |
Suitable when high precision is required. |
Suitable when accurate precision is required. |